Venting and pumping the FastCCD =============================== Venting: ~~~~~~~~ .. |TIMmanualroughingvalve| image:: ../TIM/TIM_manual_roughing_valve.jpg :width: 100% .. |FCCDmanualroughingvalve| image:: FCCD_manual_roughing_valve.jpg :width: 100% .. |FCCDTP12_controllers| image:: FCCD_TP1_TP2_controllers.jpg :width: 100% .. |N2_dewar| image:: ../FFT/N2_dewar.jpg :width: 100% .. |N2_flow| image:: ../FFT/Venting_overpressure_flowvalve.jpg :width: 100% .. |FCCD_PUMPDOWN| image:: FCCD_PUMPDOWN.png :width: 100% .. |FCCD_manualventingvalve| image:: FCCD_manual_venting_valve.jpg :width: 100% +---+-------------------------+------------------------------------------------+ |1. | |TIMmanualroughingvalve||Since TIM and FastCCD share the same roughing, | | | |first close the TIM manual roughing valve before| | | |venting | +---+-------------------------+------------------------------------------------+ |2. ||FCCDmanualroughingvalve||Close the FastCCD manual roughing valve on the | | | |back of the FastCCD. | +---+-------------------------+------------------------------------------------+ |3. ||FCCDTP12_controllers| |Switch off the TP1 and TP2 in the rack room, | | | |rack number +E21.UH2.06 | +---+-------------------------+------------------------------------------------+ |4. | |N2_dewar| |Open the N2 dewar | +---+-------------------------+------------------------------------------------+ |5. | |N2_flow| |Make sure the overpressure valve makes sound by | | | |adjusting the flow | +---+-------------------------+------------------------------------------------+ |6. | |FCCD_PUMPDOWN| |Watch the pressure in the FCCD2M_PUMPDOWN scene | | | |in loop7 and listen to TP1 and TP2 while slowly | | | |opening the venting valve | +---+-------------------------+------------------------------------------------+ |7. ||FCCD_manualventingvalve||When the pressure is in the few mbar, the | | | |venting valve can be openend fully | +---+-------------------------+------------------------------------------------+ Pumping down: ~~~~~~~~~~~~~ +---+-------------------------+------------------------------------------------+ |1. | |TIMmanualroughingvalve||Since TIM and FastCCD share the same roughing, | | | |first close the TIM manual roughing valve before| | | |pumping down | +---+-------------------------+------------------------------------------------+ |2. ||FCCDmanualroughingvalve||Open slowly the FastCCD manual valve on the | | | |roughing line | +---+-------------------------+------------------------------------------------+ |3. | |FCCDTP12_controllers| |Once the pressure is less than 2 mbar, start up | | | |TP1 and TP2 in the rack room, rack number | | | |+E21.UH2.06 | +---+-------------------------+------------------------------------------------+ |4. ||TIMmanualroughingvalve| |Once the pressure is good enough <0.1mbar in the| | | |roughing line, open the TIM manual valve again | +---+-------------------------+------------------------------------------------+