How to change GATT
Gas Attenuator to Neon¶
From the SASE3 Photon Beam Transport
SA3_MAIN
main panel, open the SASE3 Gas Attenuator.From the SASE3 Gas Attenuator
G_ATT_03
main panel, click onPause Injection
(not Stop injection). TheProcess Status
on top will changed toPAUSED
.Then open the SASE3 Gas Attenuator System Setup
G_ATT_01
panel by clicking on01 - System Settings/Pset= f(Attenuation)
.From the SASE Gas Attenuator System Set-Up
G_ATT_01
panel, open the Central Gas Injection Module Control panelG_ATT_CGI
panel by clicking onCGI Module Control Panel
.From the Central Gas Injection Module Control panel
G_ATT_CGI
panel, open the Extended panel by clicking onExtended Panel
.In the Extended Panel
G_ATT - CGI Extended
one can see the Gas Manifold with 5 different incoming gas lines consisting of 2 large gas line, Ar and N2, and 3 minican gas line.Labels of the minican gas line are not necessarily correct and one needs to know which minican gas line is the Neon gas line. The pressure indicates if minican is empty.
- Switch
N2 Mode
toOff
. - Switch
Ne Mode
toOn
if this is the right minican. - Evacuate the gas manifold by switch on the membrane pump and opening the valve at the bottom of the gas manifold.
- Pump down the gas manifold for 3 to 5 minutes.
- Switch off the membrane pump. It will automatically switch off the valve.
- Open the Ne valve.
- Switch
From the Central Gas Injection Module Control panel
G_ATT_CGI
panel, select the adequate shutoff valve according to the orifice size.- Set
Control Mode
to be1
. - Select the
Analog S.P. (set)
to a value between 4.5 to 14 mA. Below 4.0 mA the shutoff valve should remain closed. The maximum opening is obtained for a value of 20 mA. - Regulate the Analog S.P. to get the right Neon absorption in the spectrum. Switch to a different shutoff valve orifice size if the value goes outside the range of 4.5 to 14mA with the current orifice size.
- Set
How to change GATT
Gas Attenuator back to N2 with 2mbar¶
From the Central Gas Injection Module Control panel
G_ATT_CGI
panel, set theAnalog S.P. (set)
of the currently used shutoff valve to 0 to close it. Then close Shutoff valve.From the Extended Panel
G_ATT - CGI Extended
, switch the currently used minicanNe Mode
toOff
and switch the ‘N2 Mode’ to ‘On’.Use the
Automatic GAS Exchange
toOn
and click onPumpPurgetoN2
. This procedure will pump down and purge the gas manifold a few times. The procedure takes about 15 min. Wait for the N2 exchange to be finished as indicated in the status box below.Switch
Automatic Gas Exchange
toOff
.From the SASE3 Gas Attenuator
G_ATT_03
main panel, go to 2mbar.