How to change GATT Gas Attenuator to Neon¶
From the SASE3 Photon Beam Transport
SA3_MAINmain panel, open the SASE3 Gas Attenuator.From the SASE3 Gas Attenuator
G_ATT_03main panel, click onPause Injection(not Stop injection). TheProcess Statuson top will changed toPAUSED.Then open the SASE3 Gas Attenuator System Setup
G_ATT_01panel by clicking on01 - System Settings/Pset= f(Attenuation).From the SASE Gas Attenuator System Set-Up
G_ATT_01panel, open the Central Gas Injection Module Control panelG_ATT_CGIpanel by clicking onCGI Module Control Panel.From the Central Gas Injection Module Control panel
G_ATT_CGIpanel, open the Extended panel by clicking onExtended Panel.In the Extended Panel
G_ATT - CGI Extendedone can see the Gas Manifold with 5 different incoming gas lines consisting of 2 large gas line, Ar and N2, and 3 minican gas line.Labels of the minican gas line are not necessarily correct and one needs to know which minican gas line is the Neon gas line. The pressure indicates if minican is empty.
- Switch
N2 ModetoOff. - Switch
Ne ModetoOnif this is the right minican. - Evacuate the gas manifold by switch on the membrane pump and opening the valve at the bottom of the gas manifold.
- Pump down the gas manifold for 3 to 5 minutes.
- Switch off the membrane pump. It will automatically switch off the valve.
- Open the Ne valve.
- Switch
From the Central Gas Injection Module Control panel
G_ATT_CGIpanel, select the adequate shutoff valve according to the orifice size.- Set
Control Modeto be1. - Select the
Analog S.P. (set)to a value between 4.5 to 14 mA. Below 4.0 mA the shutoff valve should remain closed. The maximum opening is obtained for a value of 20 mA. - Regulate the Analog S.P. to get the right Neon absorption in the spectrum. Switch to a different shutoff valve orifice size if the value goes outside the range of 4.5 to 14mA with the current orifice size.
- Set
How to change GATT Gas Attenuator back to N2 with 2mbar¶
From the Central Gas Injection Module Control panel
G_ATT_CGIpanel, set theAnalog S.P. (set)of the currently used shutoff valve to 0 to close it. Then close Shutoff valve.From the Extended Panel
G_ATT - CGI Extended, switch the currently used minicanNe ModetoOffand switch the ‘N2 Mode’ to ‘On’.Use the
Automatic GAS ExchangetoOnand click onPumpPurgetoN2. This procedure will pump down and purge the gas manifold a few times. The procedure takes about 15 min. Wait for the N2 exchange to be finished as indicated in the status box below.Switch
Automatic Gas ExchangetoOff.From the SASE3 Gas Attenuator
G_ATT_03main panel, go to 2mbar.