Venting and pumping the FastCCD

Venting:

TIMmanualroughingvalve Since TIM and FastCCD share the same roughing, first close the TIM manual roughing valve before venting
FCCDmanualroughingvalve Close the FastCCD manual roughing valve on the back of the FastCCD.
FCCDTP12_controllers Switch off the TP1 and TP2 in the rack room, rack number +E21.UH2.06
N2_dewar Open the N2 dewar
N2_flow Make sure the overpressure valve makes sound by adjusting the flow
FCCD_PUMPDOWN Watch the pressure in the FCCD2M_PUMPDOWN scene in loop7 and listen to TP1 and TP2 while slowly opening the venting valve
FCCD_manualventingvalve When the pressure is in the few mbar, the venting valve can be openend fully

Pumping down:

TIMmanualroughingvalve Since TIM and FastCCD share the same roughing, first close the TIM manual roughing valve before pumping down
FCCDmanualroughingvalve Open slowly the FastCCD manual valve on the roughing line
FCCDTP12_controllers Once the pressure is less than 2 mbar, start up TP1 and TP2 in the rack room, rack number +E21.UH2.06
TIMmanualroughingvalve Once the pressure is good enough <0.1mbar in the roughing line, open the TIM manual valve again