|
|
Since TIM and FastCCD share the same roughing,
first close the TIM manual roughing valve before
venting |
|
|
Close the FastCCD manual roughing valve on the
back of the FastCCD. |
|
|
Switch off the TP1 and TP2 in the rack room,
rack number +E21.UH2.06 |
|
|
Open the N2 dewar |
|
|
Make sure the overpressure valve makes sound by
adjusting the flow |
|
|
Watch the pressure in the FCCD2M_PUMPDOWN scene
in loop7 and listen to TP1 and TP2 while slowly
opening the venting valve |
|
|
When the pressure is in the few mbar, the
venting valve can be openend fully |